INDUSTRY
TECHNOLOGY
DESIGN
Contact us Find out more

FLUID DYNAMICS

AQS ALGERIAN QATARY STEEL
(Midrex HDRI & CDRI)

Algeria

Technical support for piping design

Year 2017-2018

Customer Paul Wurth

TEMIRTAU
COKE OVEN GAS CLEANING PLANT

Kazakhstan

Support for piping design

Year 2018

Customer Paul Wurth

BUSHAN COKE OVEN PLANT
QUENCHING TOWER

India

Detail piping engineering activities

Year 2018

Customer Paul Wurth

ILVA TARANTO
SHOWER SHUTDOWN COKE NEW SHOWER 4 BIS

Italy

Detail piping engineering activities

Year 2018 – 2019

Customer Paul Wurth

PJSC SEVERSTALL
COKERIE, CDQ, BY PRODUCTS

Russia

Basics Fluids engineering activies

Year 2018 – 2019

Customer Paul Wurth

GIJON
AceroMittal Asturias (GTP)

Spagna

Basic Engineering Activities – Riser piping studio

Year 2019 – 2020

Customer Paul Wurth

ILVA TARANTO
ASPIROFILTERING UNITS – PRESCRIPTION 37 AIA – BATTERIES VII-VIII-IX-X-XI-XII

Italy

Detail piping engineering activities

Year 2019 – 2020

Customer Paul Wurth

PJSC MAGNITOGORSK IRON AND STEEL WORKS (MMK)
New Blast Furnace N.2

Russia

Detail piping engineering activities

Year 2019 – 2020

Customer Paul Wurth

AMSA
GAS TREATMENT PLANT (GTP)

South Africa

Technical support for piping design

Year 2020

Customer Paul Wurth

ILVA TARANTO
AFO2 CASTING FIELD AUTOMATION

Italy

Detail piping engineering activities

Year 2020

Customer Paul Wurth

CARPENTRY

JSW STEEL LIMITED
BF3 REVAMPING

India

Realization of detailed construction drawings of Blaste Furnace n°3 Upgradation carpentry

Year 2017

Customer Paul Wurth

ILVA TARANTO
SHOWER SHUTDOWN COKE NEW SHOWER 4 bis

Italia

Realization of Construction Drawings Industrial Water Tank With Auxiliary Access Structures

Year 2018

Customer Paul Wurth

ILVA TARANTO
ASPIROFILTERING UNIT PRESCRIPTION 37 AIA – BATTERIES VII-VIII-IX-X-XI-XII

Italy

Realization of Constructive Drawings of Dry Compressed Air Tank with auxiliary access structures

Year 2019 – 2020

Customer Paul Wurth

PJSC SEVERSTAL
COKE PLANT

Russia

Realization of detailed construction drawings of the CDQ (Coke Dry Quenching) carpentry

Year 2019

Customer Paul Wurth

PJSC MAGNITOGORSK IRON AND STEEL WORKS (MMK)
New Blast Furnace N.2

Russia

Realization of Construction Drawings Industrial Water Tank With Auxiliary Access Structures

Year 2020

Customer Paul Wurth

ELECTRICAL INSTRUMENTAL

AZ-ZOUR
CCGT POWER PLANT

Kuwait

Electrical detailed plant design

Year 2017 – 2018

Customer: Itel Progetti

LA CASELLA
THE ENEL CENTRAL BOX

Italy

Electrical detailed plant design

Year 2018 – 2019

Customer: Rina

BUTIA
450 MW ISO COMBINED CYCLE POWER PLANT

Iran

Electrical detailed plant design

Year 2020

Customer: Sintecnica

OUR CONTACTS

Via A. Sertoli 5D Rosso, 16138 Genova, IT

Tel. +39 392 8098661

info@3d4project.it

3D4 Project S.C.

P.IVA / C.F. 02433260995